Thursday, December 26, 2013

PROJET 8. Performance & Award night

PROJECT 8. Performance & Award night. This is the last project in sem 1.
The themes for this year performance & award night is ''The Lost Kingdom"
Every different major are given a kingdom and they have to design a costume based on their respective kingdom. And the kingdom for my major ,Quantity Surveying is MAJAPAHIT.
This is the costume of QS in the performance night !
After we discussed among all the QS members, we decided to have dancing as our performance on the performance night!!!Thanks to Nalayani, who is one of the coursemate, she introduce a great dancer as our tutor, name Jerry. We trained very hard until some of us are sick.But, we still put our full effort in our last project.
Training session at DUP


We trained overnight and just have few hours of rest before the performance night start!! We still work hard and dance infront of the lecturer although we all are feeling tired!!
   
After the performance night, we have the group photo
There are a lot of awards were given out to the students.
First prize we got was 2nd place for the banner for exhibition day.
Unexpectedly, we also got the BEST COSTUME and BEST KING awards!!!!
This is my first time help to dressing up with only cloths and pins.
Great start, great experience I got~
THIS IS THE MOST ENJOYABLE STUDIO PROJECT!!!ALL THE GOOD MEMORIES AND VERY TOUCHING !!!




Last Project ENDED!!!
 

Wednesday, December 25, 2013

PROJECT 7 : EXHIBITON


EXHIBITION , XZBITION!!
Our project 7 ,which is exhibition...all the first year students were divided based on their major. Hence, I am in then quantity surveying group.
For quantity surveying booth, we have to design a booth with construction management group. BOOTH ?? yup ! It's booth ~~~~~ we have to setup and decorate the booth to display our project work from project 1 until project 6!!!So that we can see our improvement from project 1 until project 6 !
The Decoration on the top of DRUM
After that, all the QS members gather and discusses our respective job.With the cooperation of all the members, we able to setup our booth in 2 days time !! And the decoration was nice !

Pre-exhibition all are busy decorating
Decoration of our booth !!
Banner of QS

Archi booth

QS and CM booth

BT and BS booth

ID and Planning booth



Through this exhibition, the very first time , all the qs members work together. This enable me have more communicate with my coursemates. And i personally feeling satisfy about this time exhibition !! Feeling happy to see our hardwork being pasted on the board !
QS group photo !!





Project 7 ENDED!!!

Thursday, December 12, 2013

PROJECT 6C : PHYSICAL SCALE MODEL

my group , GROUP 11 amphitheater stage THE ENFOLD !!

After the amphitheater stage design and the project report about the stage, we have to construct a scale model based on the design that we proposed......in SCALE 1:5 !!! I was shocked when I am briefing this project. It's so BIG and HUGE model that I never did before.....AND we only give 2 weeks time for finish it......
We spend alot of time to finish the scale model, me and my group members put alot of effort to settle and complete this model....We work as a group, Group spirit, No races and languages different ''membrane'' affect us as a group!!!
Timber cutting work !

My groupmates !

All are working hard !!!







Project 6c ENDED!!!

Sunday, December 1, 2013

PROJECT 6:INTEGRATED PROJECT: DESIGN & BUILD ‘AN AMPHITHEATRE STAGE’


 Project 6a & 6b : Amphitheater Stage Design & Project Report


Finally, the hardest project...hmmm... i feel so.... which is project 6. The first time that i work in such big group, 16 members from different major are in a group. And finally.....paperwork!!! 
  Basically, we need to design a amphitheater stage which located at the specific site.Need  to design an amphitheatre with the topography condition of the given site (next to the end of the HBP E08 Studio Block facing the Penang Bridge) and tropical climate of Malaysia which is characterized by heavy rain, intense sunshine, windless condition etc.
 So that, we need to do the site analysis and the design a suitable amphitheater stage. Main material is timber and the size is 4.0m (width),6.0 (length) and 5.0(height). We also need to present presentation drawings in 3 or 4 A1 cartridge papers.

  The presentation drawings of the proposed amphitheatre stage design should consists of:
           -          Key Plan (NTS) and Location Plan (NTS)
-          Site Inventory (NTS)

-          Conceptual Design sketches and relevant bubble diagrams
                 Site Plan (with roof plan of the stage and landscapes) (1:100 scale)
-          Floor Plan (1:50 scale) (along with the dimensions & specifications)
-          Elevations - Front, Rear, Right & Left Sides (1:50 scale)
-          Horizontal and Longitudinal Sections (1:50 scale)
-          3 Details of structural joints (1:20 scale)
-          at least 3 Perspectives drawings
 
The three perspective drawing

Key plan and Location plan

 
Structural joints

For this project, we are required to discuss, design and draw the amphitheatre. I had been elected to be in the costing group which suites the course/major that I am now studying in, that is quantity surveying. And for the design part, we have selected the idea from the architect student from my group CHAN LEE KANG which is cocoon concept. LAST, I am PROUD AND I have the say that GROUP 11, GALAXY 11 THE BEST !!!! 
 Project 6a&6b ENDED !!!